HB25-1014 · Bill · 2025 Regular Session · Colorado

Increasing Efficiency Division of Water Resources

Concerning measures to increase efficiency in division of water resources processes.

Official status: Became Law

Prime sponsors

Progress (from the official record)

Official summary

Official text — shown in English exactly as published by the official source. The official text controls.

The division of water resources in the department of natural resources (division) is responsible for administering water rights and issuing water well permits, among other duties. Under current law, after having received a permit to appropriate designated groundwater or construct a well outside the boundaries of a designated groundwater basin, a permit holder is required to construct the well within one year after the date of issuance of the permit. If the well is not constructed within one year, the permit expires; except that the ground water commission (commission) in the division or the state engineer, as applicable, may grant a single one-year extension. The act extends the time frame for construction of a well to 2 years, eliminating the need for the commission or the state engineer to approve a one-year extension to the initial one-year construction time frame, except for permits issued for federally authorized water projects. The act also removes the requirement that the commission or state engineer must mail a certified letter to the permit holder before a permit can be formally expired. The act allows the commission or state engineer to reinstate an expired permit if the applicant for reinstatement of the permit can show that the well was completed in a timely manner and submits a $30 fee. Under current law, the division engineer of each water division is required to decennially present to the water court a list of water rights that meet the criteria for abandonment. The act splits this decennial abandonment process into 2 batches, grouped by water division and spaced 5 years apart, beginning with 2030 and 2035. The act maintains the requirement that the abandonment process be performed every 10 years in each water division. The act extends certain time frames relating to the well permitting process. Lastly, the act eliminates final permitting requirements for non-Denver Basin bedrock aquifer wells in the designated basins. (Note: This summary applies to this bill as enacted.)

Status timeline

Every recorded action on HB25-1014, oldest first
DateLocationAction
01/08/2025HouseIntroduced In House - Assigned to Agriculture, Water & Natural Resources
01/27/2025HouseHouse Committee on Agriculture, Water & Natural Resources Refer Amended to Appropriations
02/28/2025HouseHouse Committee on Appropriations Refer Unamended to House Committee of the Whole
03/03/2025HouseHouse Committee of the Whole Amendment - Change from Passed to Lost
03/03/2025HouseHouse Second Reading Special Order - Laid Over Daily - No Amendments
03/04/2025HouseHouse Committee of the Whole Amendment - Change from ----- to -----
03/04/2025HouseHouse Second Reading Special Order - Passed with Amendments - Committee, Floor
03/05/2025HouseHouse Third Reading Passed - No Amendments
03/10/2025SenateIntroduced In Senate - Assigned to Agriculture & Natural Resources
03/27/2025SenateSenate Committee on Agriculture & Natural Resources Refer Unamended to Appropriations
04/11/2025SenateSenate Committee on Appropriations Refer Unamended - Consent Calendar to Senate Committee of the Whole
04/11/2025SenateSenate Second Reading Special Order - Passed - No Amendments
04/14/2025SenateSenate Third Reading Passed - No Amendments
05/15/2025HouseSigned by the Speaker of the House
05/15/2025SenateSigned by the President of the Senate
05/15/2025GovernorSent to the Governor
06/03/2025GovernorGovernor Signed

Recorded votes

Full text

Official record

View HB25-1014 on leg.colorado.gov

Source: Colorado General Assembly (leg.colorado.gov) · Data as of

Verify this record

This record carries a fingerprint of its official content, computed by our data pipeline with the SHA-256 algorithm — a real computation over the record itself, not a badge we award ourselves. Anyone can recompute it from the official source and compare.

SHA-256 fingerprint

7828cc2a9120f276e8b14193c96d020c1566ea1e0dbd722ad28073cb79a6d3e2

What it covers: the record exactly as the official source publishes it — its identifiers (bill number, session, jurisdiction), its official title and long title, its official summary, its status, its sponsors in published order, every recorded action, every recorded vote, and the link to each official text version — assembled in a fixed canonical form described on the How this data works page.

Computed 2026-10-28 · Algorithm: SHA-256 · Canonical form: rogata-canonical-v1

Source: Colorado General Assembly (leg.colorado.gov) · Data as of

The fingerprint does not cover our retrieval date (the “Data as of” stamp in the source line): re-fetching unchanged official content produces the same fingerprint, while any change to the official content changes it.

If you recompute the fingerprint from the official source and get a different value, one of us is out of date — please report it through the corrections log.